Project survey scope included a Topographic Survey and layout of multi-acre solar panel field.
Project survey scope included layout of multiple substation components, offsite utility corridor surveying and multiple building foundation layouts.
Project survey scope included a Topographic Survey and layout of multi-acre solar panel field.
Project survey scope included transmission line layout of a multi-mile corridor and a layout and as-built of a solar array substation.
Project survey scope included a Topographic and Right-of Way Survey for a new water main and water tank.
Project survey scope included a Topographic Survey of an existing and improved wastewater facility that included clarifiers, observed utilities, aeration basins, disinfection basin, roadways, buildings, and other improved site facilities. The survey was created for a proposed clarifier system.
Project survey scope included a Topographic Survey of an existing and improved water treatment facility that consisted of clarifiers, observed utilities, bulk storage facility, drying beds, roadways, parking, recirculation tank, multiple buildings, and other improved site facilities.
Project survey scope included a Topographic Survey, right-of-way survey of an improved roadway corridor that consisted of approximately 7 miles of surveying scope, including bridges, ponds, creeks, roadways, river cross sections, right-of-way determination of entire corridor and the location of existing utilities.
Project survey scope included a Topographic Survey, right-of-way survey of an improved roadway corridor that consisted of approximately 7 miles of surveying scope, including bridges, ponds, creeks, roadways, river cross sections, right-of-way determination of entire corridor, and the location of existing utilities.
Project survey scope included a Topographic Survey of partially improved and partially unimproved wastewater facility consisting of observed utilities, wastewater treatment facilities, roadways and future expansion site for the plant.
Project survey scope included a Topographic Survey of improved roadway rights-of-way consisting of approximately 1 mile of surveying scope, including roadways, creeks, right-of-way determination of entire corridor, and the location of existing utilities.
Project survey scope included elevated shots, pipe sizes, and structure location at each pump station and tank site.